The valve panel is the humidity control center for the MeeFog™ system. A humidity demand signal is sent from the BMS to the PLC inside the valve panel. The PLC sequences the staging valves in order to control the humidity output inside the AHU
Features:
• Up to 31 stages of fog output control.
• Motorized ball valves are slow closing toeliminate water hammer.
• Color touch-screen interface.
• Automatic sanitary flush cycle wheninactive for a 24 hour period.
• PLC controls delays to prevent overcycling.
• Humidity demand signal (4-20mA or0-10 VDC).
• BACnet option available
Sincerely Plantautomation Technology
Regards,
Client Success Team (CRM),
Please fill the all required fields....!!